Horsacott Farm, Devon -
Solar Farm:
Greener Consultants have provided planning and legal drawings for many new solar farms as well as integrating batteries into existing solar farms. This particular site based near Barnstaple in Devon consisted of 24,620 panels totalling 6.4MW of power across a 37 acre site.
The scheme involved producing all the various planning and legal drawings for the landlord and also liaising with the Distribution Network Operator (DNO) to gain a viable grid connection.
Through careful design we are pleased to say the site gained permission and is now in operation as you can see in the pictures below.
If your business needs plans for planning or legal purposes for any similar sites, please do not hesitate to get in contact.